Colonial Ave. Northbound Lane Asphalt Work – June 16-18 The City Streets team will continue asphalt work on the northbound lane of Colonial Dr. from Mendocino St. to the Helena Point Apts. entrance June 16-18 from 7 a.m. to 5 p.m.
Northwest Passage–Ambrose Connector Trail Construction Construction will also begin on a new connector trail linking the Northwest Passage Trail and the Ambrose Trail in Mount Helena Natural Park. No impacts to users are anticipated during construction.
Oakes Street Park Trail Reroute City Open Lands are working on construction of a reroute of the Oakes Street Park Trail. The existing trail will remain open until the new trail is complete, then the old trail will be decommissioned.
6th Ward ADA Corner Ramp Infrastructure Project The City Streets team will install new ADA sidewalk infrastructure in the 6th Ward neighborhood starting May 28 through the end of August 2026. Pedestrian traffic will be limited to one side of the street or the other throughout the project.
South Davis Asphalt Maintenance - June 1-4 The City Streets team will continue asphalt work on South Davis St. from E. Broadway St. to 3rd St.on Monday, June 1 through Thursday, June 4 from 7 a.m. to 7 p.m.
South Davis Asphalt Maintenance - May 27-28 The City Streets team will close South Davis St. from E. Broadway St. to 3rd St. for asphalt maintenance on Wednesday, May 27 through Thursday, May 28 from 7 a.m. to 7 p.m.
8th Ave. Main Replacement The City of Helena has contracted with Northwest Landworks LLC to replace a water main along 8th Ave. between N. Hoback Street and Idaho Ave. Temporary water service may be required periodically for affected residents. This project is estimated to take two weeks to complete and will require the temporary closure of 8th Ave.
Lawrence Water & Sewer Main Replacement The City of Helena has contracted with Northwest Landworks LLC to replace a water main along Lawrence St. between Monroe and Park Ave. and a sewer line on Lawrence between Dearborn and Benton Ave. Temporary water service may be required periodically for affected residents.
West Main/Eureka to Hale Connector The project consists of replacing an existing water main betweenthe Eureka Well and the Hale water storage tank with a new 8”water main between the well and the storage tank. A separatededicated 12” water main between the storage tank and thedistribution system on West Main Street. An additional 12” watermain will also connect from West Main to Reeder’s Village.
Wastewater Treatment Plant - Primary Scum Pump Rebuild This proposed project will replace and existing failed pump station at the City's Wastewater Treatment Plant.
Test Well Drilling This project will drill 9 test wells to determine geology and water capacity for potential public water supply wells.
Sewer Main Rehabilitation - 2019 Cured in Place Pipe This project consists of the rehabilitation and lining of approximately 11,583 lineal feet of existing clay and concrete sewer mains.
Intersection Realignment - Lawrence & Warren Streets This project addressed realignment of the intersection of Lawrence & Warren Streets to shorten the pedestrian crossing length across Lawrence Street.
Parks Improvement - Fire Tower The City completed rehabilitating the iconic Fire Tower that overlooks downtown Helena.
Parks Improvement - Memorial Park Playground The project will replace all of the playground equipment at Memorial Park.