Walnut Ave. Main Replacement

About the Project

The City is proposing to replace the the existing 6-inch water main in Walnut Street (from Interstate 15 to Airport Road) with an 8-inch PVC water main. This project includes installing 1,329 feet of 8-inch diameter PVC water main, 69 feet of 6-inch diameter PVC pipe, 8 gate valves, 8 water mains connections, and 2 service connections. Construction is expected to last from approximately October to December 2026. The contractor for this project is Montana Materials and Construction.  

Click here to view the interactive GIS map. 

Contacts

Doug Compton, PE
City of Helena  
Water/Wastewater Engineer
406-447-8073

Trent Scheuer
City of Helena
Utility Maintenance 
406-457-8575