Red Mountain Flume Maintenance and Repairs Project

Replace existing slide gate at Banner Creek Diversion, repair and replace existing Red Mountain Flume from Banner Creek head gate downstream approximately 1,450 lineal feet to the first flush gate. Project also includes minor rip rap placement at flush gate location.

Project #17-20

Estimated Cost: Not yet available

Status: In design