Lewis Street Water Main Replacement Project

Replacement of approximately 975 lineal feet of existing 4 inch steel water main with new 8 inch ductile iron water main on Lewis Street from Roberts Street East to North Harris Street. Replacement of approximately 14 existing water service lines, the addition of two new fire hydrants and the associated sidewalk ramp work as per the Americans With Disabilities Act (ADA).

Project #17-27

Estimated Cost: $351,626.00

Status: May, 2018, project is in progress, and is currently out to bid.