Chessman Dam Repairs and Maintenance Project

Replace existing slide gates within in-reservoir multi level intake structure with some concrete work, replace existing main dam gate valve and linkage within the dam structure and miscellaneous site and instrumentation work. Project will require coffer damming the existing intake structure and dewatering.

Project #17-18

Estimated Cost: No cost estimate available at this time

Status: In design

Project Plan Documents (not yet available)

Project Contact:
Jamie Clark, PE
Civil Engineer, City of Helena
Phone: 406-447-8098